Modee

Installation

Mineral Wall Installation – Video Tutorials

See how easy it is to install Mineral Wall panels step by step. We've prepared short, practical video guides to support you – from surface preparation and tool selection to the final result. Whether you're new to DIY or looking for pro tips, you’ll find everything you need here.

Watch installation videos

Downloads – Documentation

All essential documents in one place. Download technical sheets, installation instructions, Declarations of Performance (DoP), certificates and other materials useful for both planning and implementation. The documentation is regularly updated so you always have access to the latest information.

Go to documentation

FAQ – Frequently Asked Questions

Got a question? Check if we’ve already answered it! We've compiled the most frequently asked questions from our customers and provided clear, concise answers. You'll find information about products, installation, orders and more. Save time – start with the FAQ!

Find the answers

1. Prepare the wall and panels

The wall must be dry, even, and clean. Leave the panels in the room for 1–2 days before installation to let them acclimate to the temperature.

 

 

2. Measure and cut the panel

Cut the measured panel with a utility knife or a saw. Also cut out a space for the socket if needed.
 

 

 

3. Apply the adhesive

Apply the adhesive to the wall in vertical stripes every 10 cm, leaving 1–2 cm of space around the edges. Apply adhesive around any openings as well.

 

 

4. Attach the panel

Press the panel against the wall using your hand or a rubber mallet. Use a level to ensure it’s straight.

 

 

5. Join the next panels and leave gaps

Insert the next panels into the previous ones using the tongue-and-groove system. Leave a 3 mm gap at the ceiling, corners, and floor – then fill it with silicone.

 

 

Slab

Assembly instructions

download icon

Technical data sheet

download icon
Tile

Assembly instructions

download icon

Technical data sheet

download icon

Modee catalog

download icon

FAQ

search faq

No results

12 years in dry rooms, 8 years in wet rooms. Warranty applies to indoor residential use.

Modee panels come in 60 × 120 cm and 117.5 × 280 cm formats, 4 mm thick. See Products or download the datasheet for all options.

On average about 290 ml per 1.5 m², i.e. roughly 1 cartridge for 2 panels or 2 cartridges for 1 slab. Consumption depends on the thickness and density of the applied adhesive.

Apply the adhesive in vertical beads every 10 cm, keeping about 2.5 cm from the panel edges.

Dedicated profiles and accessories are available for internal, external and decorative corner finishes. See Products → Accessories for details.

The surface must be clean, dry, load-bearing, degreased and dust-free. Prime if necessary.

Yes. A utility knife or a manual/electric saw with the appropriate blade is all you need.

Absolutely! Mineral Wall panels are designed for DIY installation. Basic hand tools and the manual are all you need; we also provide step-by-step video tutorials.

No. Basic hand tools, a spirit level, tape measure, knife and adhesive gun are sufficient.

No grouting needed. Panels lock together with a tongue-and-groove system for a smooth, seamless finish.

If the substrate is porous (e.g. raw plaster), priming is recommended. On tiles or smooth surfaces, simply degrease and wipe.

Panels are easy to trim and adjust. Minor errors can be hidden with profiles or by cutting a replacement piece; plan an allowance of a few centimetres.

Yes. Modee adhesive has an open time of about 10–15 minutes, allowing precise alignment and adjustment before curing.

Yes, provided the substrate is stable, load-bearing and degreased. Modee adhesive can be applied without removing the old tiles.

The adhesive sets in about 24 hours – do not heavily load the panels during this time. Coverage rate is approx. 2–3 mm of curing per 24 h layer thickness.

Not recommended. The decorative surface is ready to use and does not require additional treatment.

Wipe with a soft cloth and mild detergent. Avoid aggressive chemicals and abrasive scrubbing.

Yes – also in wet zones such as inside a shower. Always consult the installation manual before starting work.

Yes – with electric or induction cooktops. No – directly behind gas stoves with an open flame (unless a tempered glass splashback is installed first).

No. Mineral Wall is intended for indoor use only.

Yes, but maintain proper clearance from heat sources. Consult the manual or a specialist.

Products added for comparison:

Compare